Well-designed Poly-crystalline Solar Panel 2W Factory from Argentina
Short Description:
Well-run equipment, professional sales team, and better after-sales services; We are also a unified big family, everyone stick to the company value "unification, dedication, tolerance" for Well-designed Poly-crystalline Solar Panel 2W Factory from Argentina, Inspired by the rapid developing market of the fast food and beverage consumables all over the world , We are looking forward to working with partners /clients to make success together .
Poly-crystalline Solar Panel 2W
Technical parameter
Maximum Power(W) 2W
Optimum Power Voltage(Vmp) 6V
Optimum Operating Current(Imp) 0.34A
Open Circuit Voltage(Voc) 7.2V
Short Circuit Current(Isc) 0.37A
Mechanical Characteristics
Cell Type Polycrystalline
No of Cell 12 (2x6pcs)
Dimensions 145x145x18mm
Weight 0.4KGS
Front Glass 3.2mm, High Transmission, Low iron, tempered Glass
Temperature and Coefficients
Operating Temperature(°C): -40°C ~ + 85°C
Maximum System Voltage: 600V(UL)/1000V(IEC) DC
Maximum Rated Current Series: 10A
Temperature Coefficients of Pmax: -0.435%
Temperature Coefficients of Voc: -0.35%
Temperature Coefficients of Isc: 0.043%
Nominal Operating Cell Temperature (NOCT): 47+/-2°C
Materials of solar panel
1).Solar Cell——Polycrystalline solar cell 156*156mm
2).Front Glass——-3.2mm, high transmission, low iron, tempered glass
3).EVA——-excellent anti-aging EVA
4).TPT——-TPT hot seal made of flame resistance
5).Frame——anodized aluminum profile
6).Junction Box——-IP65 rated, high quality, with diode protection
Superiority: high quality anodized aluminum frame, high efficiency long life, easy installation, strong wind resistance, strong hail resistance.
Features
1. High cell efficiency with quality silicon materials for long term output stability
2. Strictly quality control ensure the stability and reliability, totally 23 QC procedures
3. High transmittance low iron tempered glass with enhanced stiffness and impact resistance
4. Both Poly-crystalline and Mono-crystalline
5. Excellent performance in harsh weather
6. Outstanding electrical performance under high temperature and low irradiance
Quality assurance testing
Thermal cycling test
Thermal shock test
Thermal/Freezing and high humidity cycling test
Electrical isolation test
Hail impact test
Mechanical, wind and twist loading test
Salt mist test
Light and water-exposure test
Moist carbon dioxide/sulphur dioxide
Enjoy my videos on Youtube
https://www.youtube.com/user/NoMainsPowerNoProble
Never Be Without Power again.
My Three most used sayings are.
1) A house roof looks unfinished until it has solar panels on it.
2) A man is not looking after his family until he is producing his own power.
3) Solar systems can be kind of pricey at first. Having power when no one else does, PRICELESS
My videos are for information only, all work should be done by licensed contractors.
Please read and understand description before viewing this video. Thank you
By viewing the video you agree to the copyright act. You also agree to the copyright act as defined in the description of this video.
Please feel free to enjoy my Off-Grid / Grid Hybrid system and my LED lighting videos. as well as my many How to videos.
Video edited with
cyberlink powerdirector
Music Provided by
Licensed under a Creative Commons license
Purple Planet
Music: http://www.purple-planet.com
and or
Music: http://www.bensound.com
Remember if the power goes Out Then only the people that Prepared will have Power and Lights. And because of the cost. They have just enough for there needs. NOT YOURS.
Please enjoy.
Sharing a link to my videos is fine.
Do not Download then Re Upload my videos in part or full without my written consent.
Copyright 2017 All Rights Reserved.
letter of demand for breach of copyright followed by full legal action for anybody breaching the copyright act.
Warning!!! – Any person and/or institution and/or Agent and/or Agency of any governmental structure including but not limited to the United States or The Australian Federal and State Governments also using or monitoring/using this website or any of its associated websites, you DO NOT have my permission to utilize any of my profile information nor any of the content contained herein including, but not limited to my videos or photos, and…/or the comments made about my photos or any other “picture” art posted on my profile. You are hereby notified that you are strictly prohibited from disclosing, copying, distributing, disseminating, or taking any other action against me with regard to this profile and the contents herein. The foregoing prohibitions also apply to your employee, agent, student or any personnel under your direction or control the contents of this profile are private and legally privileged and confidential information, and the violation of my personal privacy is punishable by law.
ALL RIGHTS RESERVED WITHOUT PREJUDICE
This is my Hobby. It just happens to power my house.
I also Design and build systems That work.
Ambitious New York attorney Sam (Daniel Henney of TV’s THREE RIVERS, X-MEN ORIGINS: WOLVERINE) is transferred to Shanghai on assignment, partially because he’s Chinese-American. A fish-out-of-water, he stumbles into a legal mess that could spell the end of his career. With help from a beautiful relocation specialist (Eliza Coupe of TV’s HAPPY ENDINGS, TV’s SCRUBS), a well-connected foreign businessman (Bill Paxton of TV’s HATFIELDS & MCCOYS, TWISTER), a clever but unassuming journalist (Geng Lee), and a street-smart assistant (Zhu Zhu of CLOUD ATLAS), Sam might just save his job, discover romance, and learn to appreciate the many wonders Shanghai has to offer. Also starring Alan Ruck (TV’s SPIN CITY, FERRIS BUELLER’S DAY OFF).