Chinese Professional Mono-Crystalline 200W Solar Panel for Turkmenistan Factories

Short Description:


Product Detail

Product Tags

We have a professional, efficiency team to provide quality service for our customer. We always follow the tenet of customer-oriented, details-focused for Chinese Professional Mono-Crystalline 200W Solar Panel for Turkmenistan Factories, We sincerely welcome you come to visit us. Hope we have good cooperation in the future.


Mono-Crystalline 200W Solar Panel

Technical parameter

Maximum Power(W)                           200W

Optimum Power Voltage(Vmp)           37.29V

Optimum Operating Current(Imp)       5.36A

Open Circuit Voltage(Voc)                  45.48V

Short Circuit Current(Isc)                     5.89A

Mechanical Characteristics

Cell Type Monocrystalline                    125x125mm (5 inch)

No of Cell                                              72 (6x12pcs)

Dimensions                                          1580x808x35mm

Weight                                                  14.5Kg

Front Glass                                           3.2mm,High Transmission, Low Iron,Tempered Glass

Junction box                                         IP65 Rated

Output Cable                                        TUV 1×4.0mm2/UL12AWG,Length:900mm

Temperature and Coefficients

Operating Temperature(°C):                -40°C ~ + 85°C

Maximum System Voltage:                  600V(UL)/1000V(IEC) DC

Maximum Rated Current Series:         15A

Temperature Coefficients of Pmax:     -0.47%

Temperature Coefficients of Voc:        -0.389%

Temperature Coefficients of Isc:           0.057%

Nominal Operationg Cell Temperature (NOCT): 47+/-2°C

Materials of solar panel

1).Solar Cell——Mono-crystalline solar cell 125*125mm

2).Front Glass——-3.2mm, high transmission, low iron, tempered glass

3).EVA——-excellent anti-aging EVA

4).TPT——-TPT hot seal made of flame resistance

5).Frame——anodized aluminum profile

6).Junction Box——-IP65 rated, high quality, with diode protection

Superiority: high quality anodized aluminum frame, high efficiency long life, easy installation, strong wind resistance, strong hail resistance.

Features

1. High cell efficiency with quality silicon materials for long term output stability

2. Strictly quality control ensure the stability and reliability, totally 23 QC procedures

3. High transmittance low iron tempered glass with enhanced stiffness and impact resistance

4. Both Polycrystalline and Mono-crystalline

5. Excellent performance in harsh weather

6. Outstanding electrical performance under high temperature and low irradiance 

Quality assurance testing

Thermal cycling test

Thermal shock test

Thermal/Freezing and high humidity cycling test

Electrical isolation test 

Hail impact test

Mechanical, wind and twist loading test

Salt mist test

Light and water-exposure test

Moist carbon dioxide/sulphur dioxide

  • Previous:
  • Next:



  • Build 100 panel horse shade shelters to help the Mongol working class & farmers.

    The solar PV industry in China’s Inner Mongolia Autonomous Region has witnessed rapid growth over the recent years. Since 2006, several industry leaders have built solar PV projects in the region. In 2013, when the central government rolled out solar subsidies at the state level, the regional government put in place favorable policies to support the growth of the industry. However, the response from local industry players indicated that solar companies are facing challenges from the incomplete industry chain, difficulties in raising funds, burdens from excessive taxation and fees as well as complex grid connection and subsidy procedures.
    The complete solar PV industry chain covers silicon materials, silicon rods, silicon wafers, solar cells, modules and power stations. The vast majority of solar firms in Inner Mongolia are either primarily engaged in the production of silicon materials or the construction of power stations. However, the region is fully lacking in module or inverter makers, two items that play a key role in creating a complete industry chain.
    Most of the local silicon material manufacturers are suffering from funding constraints as they seek to invest in technical improvements, equipment and even the daily management of their operations. The overcapacity as well as the anti-subsidy and anti-dumping investigations against solar products from China several years ago made the banks hesitant to extend loans. In 2013, the Chinese government replaced support for building integrated PV and Golden Sun-certificated projects with subsidies for per kilowatt-hour of power electricity generated. As a result, several solar projects with approved quota yet facing financing constraints during the initial construction period could not be completed on schedule.
    The high maintenance costs and land use fees have squeezed the profits of solar PV firms in the region. A long list of taxes and fees hobble the builder of a 50 MW solar project built in Inner Mongolia: taxes for conversion of the farmland and for land use, compensation for land acquisition, disturbance of the local ecology in addition to steppe, soil and water conservation as well as land transaction fee and deed tax.
    Industry analysts indicated that the lack of favorable tax and land use polices has affected the operation of and investment in solar power generation firms.
    The distributed solar PV market in Inner Mongolia has been dragged down by the lack of roofs as well as difficulties in financing and grid connection. Although State Grid, China’s state-owned nationwide electric utility, provides free grid connection services, most of the completed solar PV projects may be unconnected for years. The facilities that finally manage to get connected often fail to fully implement the power supply and sale contracts.
    It takes at least one year for the newly connected facilities to complete the complex procedures, including power purchase and sale contracts as well as land use, water conversation, fire control and power generation certificates. They cannot apply for subsidies until these procedures are finished. Industry players expect to receive the subsidies in a timely manner as the new projects start generating electricity, which will then be measured by power dispatchers.
    Industry analysts indicated that these challenges could be addressed by encouraging the local government, electricity consumers and investors as well as power grid companies to participate in the development of the distributed solar PV market.
    With the growing importance of facilitating environmental protection and energy saving by developing and using renewable and clean energy worldwide, the development of the renewable PV industry will help Inner Mongolia transform itself into a clean energy supplier for the whole country.



    !ATENÇÃO PERIGO RISCO CHOQUE ELÉTRICO ! MEU NOVO PAINEL SOLAR 150W ,E SUPORTE QUE FIZ PRA INSTALAR OS DOIS TOTALIZANDO 300W , USO EM ILUMINAÇÃO E PEQUENOS PROJETOS EM 12V ROTEADORES APARELHOS 12V E TAMBEM NAO DEIXA DE SER UM ROBY INVERSOR E LIGADO OFF GRID FORA DA REDE SOMENTE HORAS DE PICO .OBRIGADO A TODOS INSCRITOS E VISITANTES DO CANAL

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Tree

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Cup

    WhatsApp Online Chat !