100% Original Factory Poly-crystalline Solar Panel 40W to The Swiss
Short Description:
It is a good way to improve our products and service. Our mission is to develop creative products to customers with a good experience for 100% Original Factory Poly-crystalline Solar Panel 40W to The Swiss, "Create Values,Serving Customer!" is the aim we pursue. We sincerely hope that all customers will establish long term and mutually beneficial cooperation with us.If you wish to get more details about our company, Please contact with us now
Poly-crystalline Solar Panel 40W
Technical parameter
Maximum Power(W) 40W
Optimum Power Voltage(Vmp) 17.35V
Optimum Operating Current(Imp) 2.31A
Open Circuit Voltage(Voc) 21.16V
Short Circuit Current(Isc) 2.53A
Mechanical Characteristics
Cell Type Polycrystalline 156 x 52mm
No of Cell 36 (4x9pcs)
Dimensions 670x420x30mm
Weight 4.0Kg
Front Glass 3.5mm,High Transmission, Low Iron,Tempered Glass
Junction box IP65 Rated
Output Cable TUV 1×4.0mm2/UL12AWG,Length:900mm
Temperature and Coefficients
Operating Temperature(°C): -40°C ~ + 85°C
Maximum System Voltage: 600V(UL)/1000V(IEC) DC
Maximum Rated Current Series: 15A
Temperature Coefficients of Pmax: -0.47%
Temperature Coefficients of Voc: -0.389%
Temperature Coefficients of Isc: 0.057%
Nominal Operationg Cell Temperature (NOCT): 47+/-2°C
Materials of solar panel
1).Solar Cell——Polycrystalline solar cell 156*52mm
2).Front Glass——-3.2mm, high transmission, low iron, tempered glass
3).EVA——-excellent anti-aging EVA
4).TPT——-TPT hot seal made of flame resistance
5).Frame——anodized aluminum profile
6).Junction Box——-IP65 rated, high quality, with diode protection
Superiority: high quality anodized aluminum frame, high efficiency long life, easy installation, strong wind resistance, strong hail resistance.
Features
1. High cell efficiency with quality silicon materials for long term output stability
2. Strictly quality control ensure the stability and reliability, totally 23 QC procedures
3. High transmittance low iron tempered glass with enhanced stiffness and impact resistance
4. Both Poly-crystalline and Mono-crystalline
5. Excellent performance in harsh weather
6. Outstanding electrical performance under high temperature and low irradiance
Quality assurance testing
Thermal cycling test
Thermal shock test
Thermal/Freezing and high humidity cycling test
Electrical isolation test
Hail impact test
Mechanical, wind and twist loading test
Salt mist test
Light and water-exposure test
Moist carbon dioxide/sulphur dioxide
http://www.solardave.com/index.php/how-to-get-your-solar-panel-design-approved-by-your-hoa-video/
John Forbes: The year before last (2007) Xcel (Energy) had been sending out these mailers with your bill and they were talking about their solar credit program, and I have been really interested in all things solar. I tell people that I had in the 8th grade in 1958 I was standing up in front of the class giving them my science presentation and telling them I wanted to be a solarologist.
My science fair project I had a big solar cooker made out of card board and tin foil. The next year I did one with corala algae and composting that in to methane and generating electricity from that, so I was really interested into it a long long time ago.
The prices were prohibitive and the products really were not available anyway. So I say this an I was really intrigued and the Cary Hayes and REC Solar showed up at Costco. My wife had seen him and and she said he still might be there and I got home from work and Costco was open a little later. And she took me down there and she met him. OK, I gotta do it.
And from then it was September of 2007 and I thought I would just put in my application to the Architectural Committee (Rock Creek HOA) because I had to do that for the yard and the deck and you are supposed get a 45 day turn around. Well when I didn’t get it by October – I went to inquire, I was told you can show up at the next meeting by that time – I check and gave them a little more time back in December or November I think they were skipping December and going in to January so I had to wait even longer. So I got involved, so then I found out that they were not doing anything on my application at all.
They said they couldn’t make a decision because they didn’t have any guidance. They didn’t have any rules drafted and that really made me angry. I wanted them to either up or down yes or no – because if they said not I was going to go off and sue them because under state law (Colorado Solar Access Law) there is no question I would get what I wanted – but I couldn’t sue them (the HOA) or I could not get an injunction until they actually made a decision. Which was driving me crazy!
So finally I talked to my friend Rich and told him we have to do something to make them make a decision. They insisted on drafting this one paragraph about it can’t be more than 4 inches off the roof and then they made the claim that these panels should match your roof color. So I was told they come in gray and brown and red – which is not true! I told them that is a restriction that can not be meet and you will just have to take that out, and I demanded to know what their source of information was – so they gave me a local solar contractor Rich did and he said there is not such thing as red panels!
So I want back and politely inferred that they misunderstood. So they took it out and finally they had the guidance. They were still dragging their feet. Each iteration was another month and another month and finally Rich came in a brought case law in and pressed. And hinted that they will get sued if they don’t make a decision. A week and a half later I got my decision that approved it.
I called up REC Solar and all through this process Cary Hayes was giving me support and technical information he got me and stuff. They came out (REC Solar) got the survey had their plans ready and we thought oh this is going to go through really quickly and went down to the city (Town of Superior) – well the city now…they said the electrical plan we just can’t accept that you have got to have a wet stamp, another electrical has to stamp it like a notary. That would be like getting a wet stamp to wire up your stereo – it was a delaying tacit. Further behind and cost more money because you had to pay the guy.
Eventually it was put in – the whole thing took more than a year. It could have been done in like two months. And what startled me was the people on the Architectural Committee knew nothing about solar and you would think here in Boulder County the stuff has been out there since – well I learned about it in 1958!
So asking questions like what color are the panels – what planet are you on?
So I found that whole thing kind of depressing – I was hoping that other people it would make it easier.
Thanks to our American engineering and our manufacturing plant in China and Taiwan, Amerisolar ‘s solar panels are preferred by demanding customers asking for quality and long life efficiency.
Check the presentation video to learn more about Amerisolar . – See more at: http://www.weamerisolar.eu/